Coraclefilms

RDPE 3rd project

5th January 2010

emda’s third RDPE case study is a 1000 acre farm in Lincolnshire. A ban on using water in the summer would ruin their crop. But a grant has helped them build a 60 million gallon reservoir that means they can irrigate even when there’s a ban.

« Back to the news summaries

Leeks. No Leaks.

Get Flash PlayerFlash 6 or above and JavaScript are required for the best experience.