RDPE 3rd project
5th January 2010
emda’s third RDPE case study is a 1000 acre farm in Lincolnshire. A ban on using water in the summer would ruin their crop. But a grant has helped them build a 60 million gallon reservoir that means they can irrigate even when there’s a ban.